September, 2011
Project: Painting Plant
Client: Univest (Sipco Paint)
Scope: Demobilization of Structure, removal of vessels tanks, pumps form Dammam and erecting it in Riyadh with Piping modification, additional of Equipment and structure
Equipment: 314 Tons
Piping: 2200 Inch Diameter
Structure: 66 Tons
May, 2012
Project: Replacement of Tank Bottom Plate and Shell, Tank Dia-17.95m - Shutdown
Client: SADAF SALT,SABIC, Jubail
Scope: Complete replacements of Bottom plate and partial shell plate replacement
API Tanks: 2 Nos
Weightage: 23 Tons
June, 2012
Project: Glycol Plant
Client: Ta’aheel Environmental Services, Jubail
Scope: Design, Engineering, Manufacturing, Supply & Erection of Heat Exchangers, Vessels, Piping and structure
Equipment: 104 Tons
Piping: 6500 Inch Diameter
Structure: 78 Tons
December, 2012
Project: Saudi Kayan Petrochemical Complex ACP Project for Existing HDPE Plant
Client: Intecsa, JUBAIL
Scope: Design, Engineering, Manufacturing and Supply of Pressure Vessels – 1 No, Heat Exchangers – and Jacket Heat Exchangers- 2 Nos
Pressure Vessel: 15 Tons
Heat Exchangers: 10 Tons
Jacket Heat Exchanger: 190 Tons
May, 2013
Project: Repair of Tank BTK-0227 & Tank BTK-0230- Shutdown
Client: Petrokemya SABIC, Jubail
Scope: Patch Plate on Bottom plate and shell plates
API Tanks: 2 No
Weightage: 8 Tons
June, 2013
Project: Replacement of Tank Bottom Plate and Shell, Tank Dia-17.95m - Shutdown
Client: SADAF SALT,SABIC, Jubail
Scope: Complete replacements of Bottom plate and partial shell plate replacement
API Tanks: 2 Nos
Weightage: 53 Tons
June, 2013
Project: Hydrocarbon Unit
Client: Ta’aheel Environmental Services, Jubail
Scope: Design, Engineering, Manufacturing and Supply of API Tanks – 12 Nos, Piping and structure. Equipment: 223 Tons
Piping: 3750 Inch Diameter
Structure: 22 Tons
December, 2014
Project: Bauxite Mine Infrastructure & Utilities
Client: Dragados / Leighton JV/MA'ADEEN
Scope: Design, Engineering, Manufacturing and Supply of API Tanks – 10 Nos, Piping and structure
Tanks: 482.69 Tons (10 Nos)
Piping: 12000 Inch Diameter
Structure: 50 Tons
August, 2015
Project: Repair of Ammonium Sulphate Tank 42-T-501 in UGAA Plant
Client: SAFCO , Jubail
Scope: Repair of Tank Ammonium Sulphate, including foundation repair, Supply, Design, manufacturing of Vessel, and piping work
API Tanks: 1 No (27 Tons)
Piping: 2000 Inch Dia
Knock out Drum Vessel: 1 No ( 5 Tons
October, 2015
Project: Umm Wu´al EPC Project -DAP/NPK Plant, Storage &Offsites at Ras al Khair
Client: MA´ADEN WA´AD AL SHAMAL PHOSPHATE COMPANY/Intecsa ) Ras Al Khair, Saudi Arabia
Scope: Design, Engineering, Manufacturing, Supply and erection of Tanks
Tonnage: 110 Tons (2 Nos)
June, 2016
Project: Replacement Bottom Plate for Clarifier 73 CL501 - Shutdown
Client: H K AL SAIDIQ /SADAF SALT,SABIC, Jubail
Scope: Complete replacements of Bottom plate and partial shell plate replacement
API Tanks: 1 No
Weightage: 77 Tons
October, 2016
Project: NPK/DAP Plant Project (MA´ADEN WA´AD AL SHAMAL PHOSPHATE COMPANY)
Client: MA’ADEN ( Intecsa ) Ras Al Khair, Saudi Arabia
Scope: Design, Engineering, Manufacturing and Supply of Cyclones – 1 No
Weight: 300 Tons (44 Nos)
October, 2017
Project: Jazan Integrated Gasification Combined Cycle
Client: Saipem/Saudi Aramco
Scope: Design, Engineering, Manufacturing and Supply of Heat Exchangers – 22 Nos
Equipment: Sulfur Cooler, Per meat Cooler, Compressor After Cooler, Flash Steam Condenser, Acid Gas
Reheater, Flash Gas Exchanger
Material: SA 516 Gr 70/SA 516 Gr 70 +HIC (Plate), SA 266 Gr 2/SA 350 LF2 (Forgings), SA 179/SA 334 Gr 6 (Tubes)
Weight: 260 Tons
December, 2018
Client: Rabigh Refining and Petrochemical Co. (PETRORABIGH)
Scope: Engineering, Manufacturing and Supply of Heat Exchangers – 12 Nos
Weight: 138 Tons (12 Nos)
July, 2019
Project: ABQAIQ MSC LOGISTICS FUNCTION
Client: Saudi Aramco- Abqaiq Plant
Scope: Thermal Design, Engineering, Manufacturing and Supply of Heat Exchangers – 2 Nos
Equipment: Deethanizer Overhead Condenser
Weight: 108 Tons
December, 2019
Client: Rabigh Refining and Petrochemical Co. (PETRORABIGH)
Scope: Engineering, Manufacturing and Supply of Heat Exchangers – 15 Nos
Weight: 80 Tons (15 Nos)
October, 2020
Project: Packaging Unit
Client: Fahad Chemical Co.
Scope: Design, Engineering, Manufacturing and Supply of API Tanks – 12 Nos, Piping and structure
Equipment: 224 Tons (10 Nos)
Piping: 8500 Inch Diameter
Structure: 15 Tons
December, 2020
Client: Rabigh Refining and Petrochemical Co. (PETRORABIGH)
Scope: Engineering, Manufacturing and Supply of Heat Exchangers – 12 Nos
Weight: 138 Tons (12 Nos)
October, 2021
Project: WASIT Gas Plant
Client: Saudi Aramco
Scope: Design, Engineering, Manufacturing and Supply of Heat Exchangers – 4Nos
Equipment: MEG Regeneration Reboiler
Material: SA 516 Gr 70 + UNS N08825 Clad (Plates), SA 350 LF2 + Alloy 825 WOL (Forgings), Alloy 825-UNS N08825 (Tubes)
Weight: 124 Tons
December, 2022
Project: Spent Caustic Plant ( 290 TPD)
Client: Ta’aheel Environmental Services, Jubail
Scope: Supply manufacturing and Erection including Boiler House, Neutralization Plant, Evaporation Plant, Demin Plant, Thermal Heater Plant and cooling system
Equipment: 284 Tons (10 Nos)
Piping: 59000 Inch Diameter
Structure: 277 Tons
May, 2023
Project: UWSP Surge Tanks Mechanical work – Md Form Contract
Client: Saudi Aramco
Scope: UWSP Surge Tanks D-8102 & D-8101
API Tanks: 2 No
November, 2023
Project: Jafurah Gas Compression Plants and PWIS (Saudi Aramco)
Client: L & T Hydrocarbon Saudi Company
Scope: Design, Engineering, Manufacturing and Supply of Heat Exchangers – 6 Nos, Spare Tube Bundle with Dummy Shell – 2 Nos
Equipment: Gas Compressor Re Heater
Material: SA 516 + HIC (Plates), SA 266 Gr B(Forgings), SA 179 (Tubes)
Weight: 149 Tons
Copyright © 2024 AGMF - All Rights Reserved.